Works are mainly a 5-Storey Framed Structure with block work enclosure as exterior cladding. Concrete works poured is as much as 2172m3, steel reinforcement of over 300 tonnes and roof covering of approximately 1548m2. Works also involved General finishes for walls, floors and ceiling. Specialised Installations include: specialised Installations include: Power and Lighting installations, Air-condition installations, fire detection installations, sirens and 1Nr passenger lift.