CIOB
Quality, Speed and Professionalism
Get In Touch

Accra Shippers Centre Project

Construction Of Accra Shippers Centre Project

Date2016
ClientGhana Shippers Authority
Project TypeCommercial

Project Information & Gallery

Construction of 8-storey shops & Offices consist of reinforced concrete framed structure with block wall infilling internal and external staircases. Roofed with Aluzinc covering on steel roof trusses. Glazed windows and doors, acoustic and plaster board ceiling, tiling, painting to internal and external walls. External works include pavings, car park, drainage system and horticulture.
Special installations include firefighting & alarm system, H.T Distribution, Transformer, 11kv Cabling Network, General Power Point System, Audio Visual and Telephone System, Plumbing Installation, Sewage System, Lift Installation, VRV Air-condition System, 2Nr 800KVA Gen-set and 4Nr lifts (8 Stops).

What our Clients Say

  • Michael Nelson Awuni
    Head of Projects - University of Education, Winneba

    Berock Construction delivered as promised with speed, quality and professionalism. 

  • Prof. Nana Aba Appiah Amfo
    Vice Chancellor - University of Ghana

    Berock completed our projects with a budget we never thought possible without compromising on quality and details.